UPGRADE OF RUBAVU ELECTRICAL DISTRIBUTION NETWORK FROM 6.6 KV TO 30KV


Key Project Features:

Content to be updated soon…

Project Mission:

Design, supply, installation and Commissioning of Electrical equipment to Upgrade Rubavu Network from 6.6kV to 30kV.

Deliverables:

  1. Inception report;
  2. Design study;
  3. supply and installation of:
  •   18 transformers 30/.04KV(replacing 6.6/.04KV transformers)
  •  30 KV complete GIS with panels of 1250A and or 630 A for each substation;
  • 12 KM MV 30 KV distribution lines;
  • 10 KM LV distribution lines;
  • 7.2 KM street lighting lines;

Current Status:

Content to be updated soon…